
Spotting Location
Müngsten Bridge (Müngstener Brücke), Solingen
Free riverside viewpoint in Brückenpark Müngsten, 117 m (384 ft) from the deck of Germany's highest railway bridge, where S7 and RE 47 trains cross the Wupper valley 107 m (351 ft) up.
Solingen, North Rhine-Westphalia, Germany
Verified on September 27, 2026
See everything in North Rhine-Westphalia2 spots · 2 experiencesPlan your visit
Coordinates: 51.161154, 7.134913
- Parking
- Yes
- Shelter
- Yes
- Restrooms
- Yes
- Best times
- Sunrise to late morning (May to August) for sun on the north-east face seen from the park; afternoon from the south-western hillside pavilion
- Duration
- 1-2 hours
- Cost
- Free (park); the Schwebefähre and the Brückensteig are separate paid attractions
Where to stand, park and take a break
Checked by the Spotatrain team from photographers’ positions and official sources. Tap a symbol on the map for details.
Take this spot with you — every point in your GPS app, even without signal.
Seasons
The north-east face is only front-lit on spring and summer mornings; from October to February it remains in shade from the park side, and the south-western pavilion is the better choice. The Schwebefähre runs from April, Wednesday to Sunday, 12:00-18:00, according to Haus Müngsten, and stays docked in heavy rain, frost and above 28 °C (82 °F); the City of Solingen's hiking page currently reports it out of service, so check before relying on it to cross the river.
Safety
Stay on the park paths: the bridge and its approaches are railway property, and the only authorised way onto the structure is the paid, guided Brückensteig climb. The Wupper can flood the riverside meadow; keep off it during high water. The approach road, the B229, carries through traffic; use the signed car park and the footpaths rather than walking along the carriageway.
Trains here
- Railroad
DB InfraGO — Solingen–Remscheid line (DB 2675)
- Frequency
- VRR states the S7 runs on a 20-minute interval on weekday daytimes and a 30-minute interval in the evenings and at weekends; Regiobahn states the RE 47 gives an hourly direct service
Train types
What runs here
Two passenger lines cross the bridge. The S7 "Der Müngstener" links Wuppertal Hbf with Solingen Hbf via Remscheid; the regional transport authority VRR states a 20-minute interval on weekday daytimes and a 30-minute interval in the evenings and at weekends, operated by RheinRuhrBahn (Transdev) since the December 2023 timetable change with Alstom Lint 41 railcars. The RE 47 "Düssel-Wupper-Express" links Remscheid-Lennep with Düsseldorf via Solingen; after three years of replacement buses it returned to rails on 1 July 2026 with three Siemens Mireo Plus B battery-electric units, and Regiobahn describes an hourly direct service.
Deutsche Bahn states that the renovated bridge meets modern standards for both passenger and freight traffic; no source read for this record gives a current freight frequency, so plan on passenger trains only.
The line is not electrified, so the RE 47 Mireo units cross the bridge on battery power; VRR presents the RE 47 as the first line in North Rhine-Westphalia converted entirely to battery-electric trains.
Photos & videos

Superbass
CC BY-SA 4.0

sergei.gussev
4

sergei.gussev
4

sergei.gussev
4

sergei.gussev
4

InterCityImpress
5

wwwuppertal
4

DiAuras
CC BY-SA 4.0

DiAuras
CC BY-SA 4.0

DiAuras
CC BY-SA 4.0

DiAuras
CC BY-SA 4.0

Superbass
CC BY-SA 4.0

InterCityImpress
CC BY-SA 2.0
Swipe to see all 13 photos
Best angles for photos
From the park viewpoint (this record's coordinates) the bridge's mid-point lies at a bearing of approximately 221° (south-west). You are looking at the north-east face of the bridge, which only receives direct sun while the sun is east of about 124° azimuth: at this latitude that means from sunrise until about 11:00 CEST in late June, until about 09:00 to 10:00 around the equinoxes, and not at all in midwinter, when this face stays in shade. From late morning onward the bridge is backlit from this side, which suits silhouettes of a train on the deck against a bright sky.
A 16-35 mm lens takes in the whole 170 m (558 ft) arch from the valley floor; a 70-200 mm isolates a two-car train on the deck.
For afternoon light, the OpenStreetMap-mapped viewing pavilion "Kamaradschaft Biene" on the Müngstener Brückenweg, on the hillside south-west of the bridge (51.15704, 7.12977), looks north-east at a bearing of approximately 37° towards the south-west face from approximately 460 m (0.29 mi). That face is sunlit from late morning until sunset through most of the year.
The full guide
Trainspotting Experience
The standing point is an OpenStreetMap-mapped viewpoint on the Müngstener Brückenweg footpath in Brückenpark Müngsten, on the west bank of the Wupper, north-east of the bridge's mid-point. From here the deck of the Müngsten Bridge is approximately 117 m (384 ft) away horizontally and about 100 m (330 ft) overhead, so trains are seen from below, framed by the 170 m (558 ft) main arch.
The line is the non-electrified Solingen–Remscheid railway (DB line 2675), carried across the bridge on two tracks as mapped in OpenStreetMap. Two passenger services use it: the S7 "Der Müngstener", run by RheinRuhrBahn with Alstom Lint 41 diesel railcars, and the RE 47 "Düssel-Wupper-Express", back on rails since 1 July 2026 with Siemens Mireo Plus B battery-electric trains run by Regiobahn.
There is nothing to climb and no fence to cross: the park is a public green space created jointly by Solingen, Remscheid and Wuppertal, and its footpaths pass directly beneath the arch. The nearest station, Solingen-Schaberg, sits at the western end of the bridge, approximately 540 m (0.3 mi) from the viewpoint in a straight line but up the valley side.
Landscape, Setting & Local Atmosphere
The Wupper runs through a narrow, wooded valley here, and the bridge spans it from the Schaberg side of Solingen to the Remscheid bank. Below the steel, the Brückenpark is open meadow along the river with paths, benches and a playground, while woodland climbs the steep slopes on both sides. The City of Solingen describes the structure as light and floating rather than massive, and from the valley floor that is the effect: more than 5,000 tonnes of riveted steel (Deutsche Bahn's figure) drawn as a lattice against the sky.
The river is small and shallow at this point, and the hand-pulled Schwebefähre (suspended ferry) crosses it a few metres above the water, a short walk downstream from the viewpoint.
Historical or Cultural Relevance
Deutsche Bahn dates construction to 1893-1897 and the opening to traffic to 15 July 1897; until after the First World War the structure was called the Kaiser-Wilhelm-Brücke. It is 107 m (351 ft) high and 465 m (1,526 ft) long, with a central arch of 170 m (558 ft), and Deutsche Bahn describes it as the highest steel railway bridge in Germany. The City of Solingen notes that it shortened the rail route between Solingen and Remscheid from 44 km (27 mi) to 8 km (5 mi).
Deutsche Bahn renovated the bridge in three phases between 2013 and 2021 (new deck, roller bearings, corrosion protection on 52,000 square metres (560,000 sq ft) of surface, new inspection equipment), investing more than 30 million euros. The City of Solingen lists it as a monument of national importance since 2012, and a joint UNESCO World Heritage application with large arch bridges in Portugal, France and Italy was launched in 2017. In 2025 the Bundesingenieurkammer named it a Historic Landmark of Civil Engineering in Germany.
What Makes This Spot Different
This is the highest railway bridge in Germany, and a free public park sits directly underneath it, so the valley floor below the arch is an unticketed, unfenced vantage point. The line also shows two generations of regional trains on one 1897 steel arch with no overhead wires: diesel Lint 41 railcars on the S7 and, since July 2026, battery-electric Mireo Plus B units on the RE 47.
Frequently Asked Questions
QCan you watch trains cross the Müngsten Bridge for free?
Yes. Brückenpark Müngsten, directly beneath the bridge on the Wupper, is a public park; the viewpoint in this record is on its footpath approximately 117 m (384 ft) from the deck.
QWhich trains cross the Müngsten Bridge?
The S7 "Der Müngstener" (RheinRuhrBahn, Alstom Lint 41 diesel railcars) and, since 1 July 2026, the RE 47 "Düssel-Wupper-Express" (Regiobahn, Siemens Mireo Plus B battery-electric trains).
QHow often do trains cross?
VRR states the S7 runs on a 20-minute interval on weekday daytimes and a 30-minute interval in the evenings and at weekends. Regiobahn describes the RE 47 as an hourly service.
QWhen is the light best?
From the park, the bridge face you see is only sunlit on spring and summer mornings, until about 11:00 in late June. In the afternoon, use the hillside pavilion south-west of the bridge, which faces the sunlit south-west side.
QHow do I get there by public transport?
The City of Solingen lists bus lines 605, 658 and 687 to the stop Müngsten Brückenpark. Solingen-Schaberg station, served by the S7 and RE 47, is at the western end of the bridge, up the valley side.
QHow high is the Müngsten Bridge?
Deutsche Bahn gives 107 m (351 ft) high and 465 m (1,526 ft) long, with a 170 m (558 ft) central arch. It opened to traffic on 15 July 1897.
Help improve this page
Spotted something out of date or incorrect? Let our community know.
Around Solingen
1 place on Spotatrain within 25 km of Solingen — 1 experience.
- Wuppertal Schwebebahn 11 km
Spots Near Solingen
More Spots in Germany
Nearby attractions
- Müngstener Brückensteig0.1 miles / 0.1 km
Paid, guided climb of 777 steps along the arch to a platform at 100 m (330 ft), according to the City of Solingen.
- Schwebefähre Müngsten0.2 miles / 0.3 km
Hand-pulled suspended ferry across the Wupper in the Brückenpark, run from Haus Müngsten; seasonal and weather-dependent.
- Wuppertal Schwebebahn6.5 miles / 10.4 km
The suspended monorail through Wuppertal, reached by S7 from Solingen-Schaberg to Wuppertal Hbf.
- Schloss Burg1.8 miles / 2.9 km
Hilltop castle above Unterburg, on the City of Solingen's hiking route 1 from the Brückenpark.
Hotels & places to stay near Solingen
Sources & official links
- Müngstener Brücke — Deutsche Bahn (DB in NRW)www.deutschebahn.com
- Müngstener Brücke — City of Solingensolingen.de
- Hiking route 1: Müngstener Brücke, Brückenpark und Wupperberge — City of Solingensolingen.de
- VRR and RheinRuhrBahn sign the S7 transport contractwww.vrr.de
- Line RE 47 — Regiobahnwww.regio-bahn.de
- Welterbe Müngstener Brücke e.V.www.welterbe-muengstener-bruecke.de
- Müngstener Brücke — Wikipedia (de)de.wikipedia.org

