ProRail's live view of the Oostertoegang bridge replacement east of Amsterdam Centraal

Amsterdam — De Vijf Bruggen, Camera 1

ProRail — Oostertoegangsspoorbrug ("De Vijf Bruggen"), east approach to Amsterdam Centraal · Amsterdam, North Holland, Netherlands

This operator has not granted Spotatrain permission to embed the feed, so we link to it instead.

Watch at ProRail

Streamed by ProRail

Stream hosted by ProRail. Spotatrain links to the original feed and does not rebroadcast.

Credit: Bron: ProRail (stated for text reuse; does not itself authorize image/video use, which ProRail says always needs prior permission)

Where this camera films

Loading map...

Camera position: 52.37787, 4.90522

Location
Amsterdam, North Holland, Netherlands
Railroad

ProRail — Oostertoegangsspoorbrug ("De Vijf Bruggen"), east approach to Amsterdam Centraal

Through the seasons
Construction-project camera tied to the Oostertoegang bridge replacement (ProRail, "De Vijf Bruggen"). Expected to be retired once the programme completes; no end date published as of 2026-09-21.

Weather & light at the camera

Sun times calculated for this camera’s coordinates.

Trains on this camera

Train types

NS passenger trains

About this cam

A ProRail construction webcam overlooking the Oostertoegangsspoorbrug — the five railway bridges on the east side of Amsterdam Centraal — being replaced one by one over a multi-year programme. The bridges, several dating to 1917 on piers from 1889, carry ten tracks used by trains entering and leaving the station from the east.

ProRail is replacing the five railway bridges known as the Oostertoegangsspoorbrug, which carry ten tracks over the Oostertoegang waterway on the east side of Amsterdam Centraal, between Stationsplein and Oosterdokseiland. Several of the spans date to 1917 and their piers to 1889; the programme replaces them one at a time so the station can stay in service throughout construction.

Each new bridge is fabricated off-site and floated in by barge, avoiding truck traffic on the busy De Ruijterkade quay. Bridge 5 entered service in April 2025, with the remaining spans following at roughly one bridge per year. The work is part of ProRail's national Programma Hoogfrequent Spoorvervoer (PHS), a multi-billion-euro programme to raise train frequency on the busiest Dutch lines — officially tracked by the Dutch government as one of its "megaprojecten" (Rijksbegroting, Artikel 17).

What to watch for

Bridge segments arriving by barge, crane lifts over the Oostertoegang waterway, and the steady flow of NS passenger trains crossing the temporary and permanent spans into Amsterdam Centraal.

The camera

Stream
YouTube live stream
Filming
Railway bridge
Traffic
Passenger
Sound
Video only, no audio
Hours
Streams around the clock, 24/7