Amsterdam — De Vijf Bruggen, Camera 2
A second ProRail angle on the Oostertoegang bridge replacement, Amsterdam Centraal
Amsterdam — De Vijf Bruggen, Camera 2
ProRail — Oostertoegangsspoorbrug ("De Vijf Bruggen"), east approach to Amsterdam Centraal · Amsterdam, North Holland, Netherlands
This operator has not granted Spotatrain permission to embed the feed, so we link to it instead.
Watch at ProRailStreamed by ProRail
Stream hosted by ProRail. Spotatrain links to the original feed and does not rebroadcast.
Credit: Bron: ProRail (stated for text reuse; does not itself authorize image/video use, which ProRail says always needs prior permission)
Where this camera films
Camera position: 52.37803, 4.90236
- Location
- Amsterdam, North Holland, Netherlands
- Railroad
ProRail — Oostertoegangsspoorbrug ("De Vijf Bruggen"), east approach to Amsterdam Centraal
- Through the seasons
- Construction-project camera tied to the Oostertoegang bridge replacement (ProRail, "De Vijf Bruggen"). Expected to be retired once the programme completes; no end date published as of 2026-09-21.
Weather & light at the camera
Sun times calculated for this camera’s coordinates.
Trains on this camera
Train types
About this cam
A second ProRail construction webcam over the same Oostertoegang bridge-replacement worksite east of Amsterdam Centraal, framed from a wider vantage over the station's eastern track fan-out. Part of the same "De Vijf Bruggen" programme as Camera 1.
This is the companion feed to "De Vijf Bruggen" Camera 1, run by ProRail over the same worksite: the replacement of the five railway bridges (Oostertoegangsspoorbrug) carrying ten tracks over the Oostertoegang waterway on the east side of Amsterdam Centraal. The two cameras cover the site from different angles so the whole span of works — the bridge decks, the barge deliveries and the adjoining track throat — can be followed.
The work is part of ProRail's national Programma Hoogfrequent Spoorvervoer (PHS), a multi-billion-euro programme to raise train frequency on the busiest Dutch lines, and is officially tracked by the Dutch government as one of its "megaprojecten" (Rijksbegroting, Artikel 17).
What to watch for
The dense fan of electrified tracks entering Amsterdam Centraal from the east, NS passenger trains threading through the worksite, and the bridge-replacement activity shared with Camera 1.
The camera
- Stream
- YouTube live stream
- Filming
- Railway bridge
- Traffic
- Passenger
- Sound
- Video only, no audio
- Hours
- Streams around the clock, 24/7
- Camera movement
- Fixed view
- Feed checked
- September 21, 2026
Explore around Amsterdam
3 places on Spotatrain within 25 km of Amsterdam — 3 live cams.



